“Called on Monday, survey was Tuesday, charger was blinking green by Thursday afternoon. I've had contractors take longer to call me back.”


Level 2 & DC Fast chargers for homes, parking structures, and loading docks
Full permit filing, load calculations, and panel upgrades handled in-house
We leave a blinking green light where there used to be a blank wall
Licensed & insured in
Hover any card to see exactly what happens, how long it takes, and what you should expect to see. No mystery. No upsells. Just the work.
TAP ANY CARD TO FLIP · 8 STEPS · AVG 4.5 HOURS TOTAL
We read the house before touching a wire.
1/8
A certified electrician walks your property — panel location, amperage rating, conduit routing options, parking position. We photograph everything.
Math before metal.
2/8
We calculate your total connected load vs available capacity. NEC 220.87 compliant. We determine if your panel can handle the new circuit or needs an upgrade.
We handle the paperwork. You handle nothing.
3/8
We pull the electrical permit from your AHJ (Authority Having Jurisdiction). We know every county's portal, turnaround time, and inspector preferences.
Only when the math demands it.
4/8
If your panel is maxed out, we upgrade from 100A to 200A — or add a sub-panel to the garage. Full replacement with Square D QO or Eaton BR. POCO coordination handled.
Clean bends. Labeled. Inspectable.
5/8
EMT conduit routed per the survey plan. Every bend made with a Greenlee bender. Every run labeled. Weatherproof fittings at transitions. This is the work that separates professionals.
The part you actually came for.
6/8
EVSE mounted at 48" center, torqued to spec, wired with 10AWG or 8AWG THHN depending on amperage. Tesla Wall Connector, ChargePoint Home Flex, Eaton Ev8, or your choice.
Inspector signs off. We stay until they do.
7/8
AHJ inspector reviews the installation. We're on-site to answer every question and correct anything on the spot. 98.4% first-pass rate across all jurisdictions.
Green light. Every time.
8/8
We commission the charger — app pairing, schedule configuration, load-sharing setup if multi-unit. We walk you through every feature. You drive away charging.
* Steps 4 (Panel Upgrade) applies to ~15% of residential installs. All other steps are universal.
Schedule My Site Survey →Level 2 charging at home means waking up to a full battery every morning. We get you from 120V trickle to 48A wall connector before the weekend.

EV charging is now the #1 requested amenity in multifamily. We design, permit, and install networked charging for parking decks — from 4 stalls to 400.

DC fast charging at your depot means vehicles leave fully charged every morning. We handle utility coordination, demand charge mitigation, and fleet management integration.
The card grid above showed you every move. The form below books the first one.